The project brief was to upgrade our 4 way pallet production to improve quality and increase our production efficiency and reduce change over times. During October 2016 we took delivery of a fully automated quick changeover 4 way pallet production line that incorporates our 6th Robot enabling us to manufacture 4 pallets per minute. The robot incorporates the latest suction lifting system thus delivering the base boards to the production line prior to final assembly. Another key point to the line efficiency is the change over time, a complete changeover takes 40 minutes and a part changeover takes just 15 minutes.

This represents a significant investment in the future of the business and demonstrates our commitment to maintain our competitiveness and manufacture to some of the highest quality standards available in the UK.